University of Canberra – Laboratory Project

March 2013 ($13.6M)
NSW – Australia

The project scope for the new laboratory facility at the University of Canberra includes the construction of a 4 storey building comprising:
- undercroft cycle/carparking space with potential Tutorial & Teaching facilities
- 1st floor – Mega Laboratory – a teaching laboratory with support facilities
- 2nd floor – Pharmaceutical Science & Pharma Laboratory – teaching laboratory with support facilities
- 3rd floor – Research laboratory with support facilities.
The facade to the building is dominated by vertical brick banding – the building has full/partial height vertically fixed metal fins to the east facade.
The project is aspiring to a 5 star green star.

University of Sydney – Centre for Carbon Water and Food

October 2012 ($10.5M)
NSW – Australia

Due for completion in October 2012, the project involves the construction of a new 3-storey building containing offices, laboratories and meeting facilities. Project works include:
Level 1 – an initial preparation room, biogeochemistry laboratory, plant preparation laboratory, soil preparation, incubator room, store room, 2 cold rooms & 2 freezer rooms. This level also includes a dry laboratory, wet laboratory, analytical laboratories, image analysis & microscope room, plant physiology laboratory, balance room & bulk storage.
Level 2 – contains office space & amenities and a total of 32 academic offices are provided on the second level.
Level 3 – contains an accessible concrete roof, and an open roof area of 230 sq m. The western end of the building at level 3 would be used to provide general services such as amenities, staff kitchen, information technology services room & store room.

Charles Sturt University – National Wine and Grape Industry Centre

September 2012 ($7.2M)
NSW – Australia

The NWGIC is located on the grounds of Charles Sturt University’s Wagga Wagga Campus.
Designed by DesignInc Architecture, the project works include the part refurbishment and additions of two existing buildings and the construction of a new three-storey laboratory building (including roof plant-room area) to provide for additional research laboratory space, functional staff and education areas and a larger cellar door facility for CSU wines and cheeses.
The Services within the facility include: Level 1 – Cellar, Lounge Room, Wine Store, Office, Wet Areas; Level 2 – Shell Structure Only; Level 3 – Radiation Room, Office, Calibration Room, 4x PC2 Lab Rooms, Wet Areas, Cool-Room, Freezer Room; Level 4 – Plant Room & Attic Level.

University of Ballarat Science and Engineering Precinct

March 2013 ($31.7M)
Vic Australia

Construction of a new facility for undergraduate and post graduate courses and research in occupational health and safety, Environmental Management, Mining Engineering, Metallurgy, Geology, Civil Engineering and Structures, Mechanical Engineering, Biomedical Sciences, Chemistry and Food Science and Technology as well as housing Administration and the Head of School.

Elizabeth Macarthur Agricultural Biosecurity Upgrade Works

November 2011 ($43.0M)
NSW – Australia

The $56 million ($43.0M construction) upgrade of biosecurity facilities included the construction of a large new secure laboratory precinct. It will include high-containment certified PC2 and PC3 laboratories for virology, bacteriology, microbiology and molecular biology; refurbishment of existing animal and plant health laboratories, and an upgrade of electrical and safety systems.
Cockram Construction was engaged in an early tender involvement (ETI) process with NSW Public Works which essentially required us to provide feedback on documentation and potential design issues/risks. At this time we identified one of the key issues for the client was the programme and at tender time proposed a temporary PC2 certified laboratory structure to house researchers between moves so as not to disrupt their research. This in turn also cut 12 months off the practical completion date.

Clinical School, Education & Research Centre

January 2011 ($16.0M)
NSW – Australia

Located within the Blacktown Hospital precinct, Cockram Construction delivered the Blacktown Clinical School, Education and Research Centre Project whilst the adjoining Blacktown Hospital remained fully operational. The project, constructed for The University of Western Sydney and Sydney West Area Health Service, has a new three-storey building including clinical trial areas, wet labs, dry labs, lecture theatres, student overnight accommodation, library and other associated staff amenities. The complete fitout of laboratories and administration areas including offices and workstations is also included in the project works. The building, designed by McConnell Smith Johnson, has a complex and impressive facade which is a combination of glass, decorative timber, stone and tile works. This is the second project Cockram has undertaken with the University of Western Sydney.

 

Sydney Institute of Marine Science

October 2011 ($10.0M)
NSW – Australia

Project works involved the refurbishment of a number of existing heritage buildings.  Some of the buildings were refurbished into PC2 laboratories including installation of temperature control rooms and a sea water reticulation system.
- Building 2 – AV system installation

- Building 11 – wet lab & temperature control room’s installation.

- Building 19 – demolition of most internal walls including asbestos removal, new mezzanine structure & roof framing,
new roofing, new walls & finishes through-out, new exterior deck, new internal stairs, new external
ramp & stairs, new rainwater plumbing system, solar panel hot water & general electrical services
upgrade.

- Building 21- New external deck access & AV refurbishment

- Building 22 – demolition & general refurbishment of PC2 labs

- Building 23 – demolition & general refurbishment of PC2 labs

The facility for SIMS is partnered with Macquarie University, University of New South Wales, University of Sydney and The University of Technology Sydney.

SMART Infrastructure Facility

December 2010 ($35.2M)
NSW – Australia

The SMART Infrastructure Facility project team have successfully handed over our fifth project for The University of Wollongong. The $35.2 M Construction Management project commenced in April 2009 and was constructed on the main campus of the University concurrently with the recently completed Illawarra Health and Medical Research Institute. The gross floor area is approximately 12,000m² which consists of a four storey concrete structure including a detailed façade system, external brickwork, structural steel components and three link bridges to connect to neighbouring buildings. Internally, the ground floor will resemble a large open area for manufacturing, research and teaching – features include’ overhead gantry facilities and a ‘Strong Floor. The upper levels include specialised research facilities, teaching laboratories, collective research spaces, lecture theatres and teaching spaces to assist with research in transport modelling, supply chains and monitoring and analysis of infrastructure. The SMART Infrastructure Facility has been designed to meet a 4 star green star rating and includes detailed services, solar panels, low VOC content through internal finishes, day-light monitoring, skylights and open-able windows.

Dow Chemicals R & D Centre

May 2009 (US$130.0M)
Shanghai – China

Three buildings comprising Dow’s 88,000m2 R&D Centre. The larger buildings are the R&D building and the Administration building and the smallest is the Central Utilities Building (CUB).   The R&D and Administration buildings include undercover car park, 64 light laboratories and 1 heavy laboratory, offices, a 700 seat restaurant, Gymnasium, Presidents suite and Badminton court.
The building has an open area through the center with a glass atrium roofprotecting the space.
The CUB building houses the High Voltage and Low Voltage Electrical rooms, Boiler room, Ice chiller tank, Chillers and Fire protection room and holding tank etc.

Monash University STRIP, Stage 2

April 2009 ($70.0M)
VIC – Australia

The Science Technology Research and Innovation Precinct project consists of two four-storey rectangular buildings totalling 17000m2, joined by a central circulation core. The buildings accommodate PC2 laboratories and an animal research level with a higher level of containment to the general laboratories.
The structure is a combination of precast concrete columns and walls, post tensioned suspended concrete slabs and structural steel framing to roof and plant room.  The buildings are clad in a curtain wall system of glass, aluminium and composite metal cladding including sun shades.  The fitout consists of offices, highly sophisticated laboratory and support spaces, used as a research and teaching facility.

Awards 2009 MBAV AWARD WINNER
EXCELLENCE IN CONSTRUCTION OF COMMERCIAL BUILDINGS – $30M TO $80M

2008 MBAV AWARD WINNER
EXCELLENCE IN HEALTH AND SAFETY

Asbestos Disease Research Institute (Bernie Banton Centre)

September 2008 ($8.6M)
NSW – Australia

This state of the art facility is located adjacent to the ANZAC Research Institute at Concord Hospital and is the world’s first stand-alone research facility dedicated to asbestos-related disease.  The building for the Asbestos Disease Research Foundation, comprises of a 2,700 sqm 2 storey research facility with six wet laboratories, two dry laboratories, shared core laboratories, education and meeting rooms. The project also includes the complete fitout of laboratories and administration areas including offices and workstations and the exterior has an impressive multi-finish facade with up lights.

DSTO Site Rationalisation Project Stage 2a

December 2006 ($53.8M)
VIC – Australia

Construction works associated with four buildings on a secure Defence site. Work included general laboratories, industrial laboratories, offices, conference theatre, library and other general facilities. This project was completed in an operational Defence facility, with highly stringent security requirements.

Victoria Agribiosciences Centre

September 2005 ($16.5M)
VIC – Australia

This greenfield project comprised a new PC2 laboratory and office building for five tenants including the Department of Primary Industries, Florigene Flowers and La Trobe University.  The building consists of two levels with an overall floor area of approximately 6,000m2 and external car parking and is located in La Trobe University Research and Development Park. A special feature of the project is the façade which is made of many different materials, included cement sheet, alpolic, Stramit metal cladding, precast concrete and Laminex Trespa Meteon cladding.

Awards-2006 MBAV AWARD WINNER
COMMERCIAL BUILDINGS – $15M TO $20M