Origin Energy Fitout

March 2012 ($46.2M)
Vic Australia

Fitout to approximatley 24,000m² for OPrigin energy’s Melbourne premises in the CBD. The fitout includes Tenancy C at ground level and offices levels 1 through to 20, (noting levels 10 and 11 are plant levels)

88 George Street Refurbishment

December 2007 ($5.3 M)
NSW – Australia

The Sydney Harbour Foreshore Authority (SHFA) appointed Cockram as construction contractor for the refurbishment of a six-level heritage building at 86-88 George Street, The Rocks. SHFA is responsible for Sydney’s most historically and culturally significant waterfront locations. This project involved the demolition and construction works to refurbish the basement, ground floor, level 1, level 4, level 5 and the external podium.  Each floor is approximately 2,200 square metres. It included the replacement of all services including a new passenger lift. Extensive protection of heritage features and fittings was required during the construction works, as well as minimising noise and disruption to both the existing tenants in the building and visitors to The Rocks.

.

GREEN BUILDING COUNCIL
FIRST STATE HERITAGE LISTED BUILDING IN AUSTRALIA
TO ACHIEVE A FIVE STAR RATING

Building 7 Botannica Corporate Park

April 2009 ($15.0M)
VIC – Australia

Design and construction of Base Building of 4 levels of office and 2 levels of basement carpark including 1 level for plantroom, total of 7 levels.
The building achieved an ABGR rating of 4.5 stars and Greenstar rating of 4.0 stars for design.

Hume City Council Offices

August 2007 ($22.0M)
VIC – Australia

A new owner-occupied office building for Hume City Council.  The building is 6 storeys plus a plant level and basement carparking and storage and is approximately 6,000m2.  The project is designed to achieve a Greenstar (TM) rating of 5, and the building design and materials are consistent with this.

DSTO Site Rationalisation Project Stage 2a

December 2006 ($53.8M)
VIC – Australia

Construction works associated with four buildings on a secure Defence site. Work included general laboratories, industrial laboratories, offices, conference theatre, library and other general facilities. This project was completed in an operational Defence facility, with highly stringent security requirements.