Projects
  • Region
  • Sector

Middle East

King Hamad General Hospital

July 2009 US $250M
Muharraq – Kingdom of Bahrain

A 312 bed secondary general and teaching hospital, this project  consists of the construction and commissioning of the new four storey hospital located in Muharraq, Kingdom of Bahrain. The hospital  is being built on partly reclaimed land with an overall site area of 227,000m2.

The hospital comprises three blocks over four levels, with level one (the Podium basement) concealed by Earth Berms. The three trapezium shaped buildings are generally of concrete ground slab and footings, concrete suspended slab, beams and columns, steel framed walls with aluminium cladding, suspended concrete slab roof with waterproof membrane, aluminium framed windows and louvers, stud wall framing and suspended ceilings.