Lion Dairy Distribution Centre

This project comprises of an extension to the facility that is currently in operation within the existing distribution centre site. Works include a new additional cool room and bio retention basin. The design has been incorporated with the construction of a 200m2 cool room along with associated roofing, civil and landscaping works. The project was complex due to the operational nature of the existing distribution centre at the front of the site. Therefore, careful planning and coordination of all activities was critical to the successful completion of the not only the Cool Room project, but also the core operational activities of the centre. This, coupled with construction traffic utilizing a shared access via the centres only operating driveway, shared use of the building busy loading bay and interface with the franchise owners and delivery trucks resulted in a challenging project.