Pfizer Utilities Infrastructure Project

Infrastructure upgrade throughout Pfizer’s 23 Acre Mumbai facility. Included was Roads, drains, paths, lighting and landscaping, a gatehouse security building, meter room to house the incomers for the 22kV site power from the local authorities and a cable, 350m from the meter room to the Panel room which houses all the site wide electrical distribution panels and transformer, a pipe rack runs throughout the site providing services to all buildings. Adjacent the panel room are 2 1200kVA diesel generators for 100% power backup, a fuel oil tank farm provides fuel oil for the generators, diesel fire pump and boilers.
A 750m3 water tank and a pump-house supply water to the site and fire sprinkler and fire hydrant systems to all of the buildings throughout the site. A utilities building houses the Soft water filtration system and associated plant and equipment, services are provided from this building to all the others. This project was not required originally as all services were provided from the adjacent facility however part way through construction all services to the site were terminated which made this project a necessity.