Projects

Sidney Myer Music Bowl Refurbishment

Major areas for refurbishment included replacing the canopy due to the prolonged water penetration through the edges of the ‘Alumply’ panels causing deterioration of the plywood and some delamination of the aluminum cladding; the entire canopy was therefore replaced with a new cladding system which utilises an equivalent of the existing material.